FAQs


How do I schedule a job with your company?
Call us to make an appointment. Once your order is placed on our schedule you can email PDF plans or have them delivered to us.

How do I get to your office?
Please see this Map.

What information do we need to provide for Residential Title 24 Documentation?
• Architect name & address
Owner name & address
Project address(if different)
Accurate North Arrow
To scale Floor Plan
Sections for clarification when needed
Elevations or Window/Door Schedule
     (Single or Double)
     (Metal or Nonmetal)
     (Brand if known)
Heating System type & duct location
If hydronic heating
     (Separate or Combined w/ DHW)
Water Heating system

ADDITIONS may require *EXISTING INFORMATION:
Existing Window/Door information
Windows/Doors removed
Windows/Doors being replaced in Existing
Floor type
    *We will notify if this information is needed

What if I don't have all of the information needed for Title 24 documentation?
Just provide us with the information you have and we will make some assumptions to provide preliminary results.

What information do we need to provide for Commercial Projects?
We need to know the scope of the project: Envelope, Lighting, or Mechanical. Envelope compliance & Lighting compliance can be done separately but Mechanical must include Envelope information. Compliance can be done for all three, individually, or any combination of two.

For Mechanical Compliance:
All Exterior assemblies
Type & Sizes of Windows, including Frame
Area served by each HVAC unit
System Make & Model
Heating & Cooling Capacity (Btu/hr)
CFM
Brake Horse Power of supply fan
Applicable efficiency (AFUE/HSPF/COP/SEER/EER)
Economizer

For Commercial Lighting:
Reflected Ceiling Plan
Fixture Schedule
Input Watts per Fixture
# and type of lamp for each Fixture

For Commercial Envelope:
All Exterior assemblies
Type & Sizes of Windows, including Frame

*It's okay if you don't have all of the above information; we can get started on the project and assist in finding the rest of the information.

Do I have to use all fluorescent lights?
Kitchens need to have 50% of the watts of lighting be high efficacy(fluorescent or LED). Laundry rooms, utility rooms and garages must have all high efficacy lighting and have the lighting controlled by a vacancy sensor. Bathrooms must have at least one high efficacy fixture and the others controlled by a vacancy sensor. All other rooms may have all incandescent lighting when controlled by a manual dimmer or vacancy sensor. Outdoor lighting mounted to the building must be high efficacy or be controlled by a motion sensor and timer. Call us to discuss these requirements if you wish.

What Insulation do I need to specify?
The Mandatory minimums are.R-30 for roofs (R-19 ok for existing framing), R-19 for floors and R-13 for framed walls. The standard project in the Bay Area will usually have a R-30 Roof, R-13 Walls and R-19 Floors.

How Thick are the different Insulations?
Batt Insulation Standard(std), High density(HD)
R-38 (std)12.5" (HD)10.5"
R-30 (std)10.5" (HD)8.5"
R-19 (std)6.25"
R-13 (std)3.5"
R-21 (HD)5.5".
For more information on insulation R-values and thicknesses, please call us.

How can Energy Calc Co. help me save energy and money?
We have a broad spectrum of knowledge with respect to energy use in residential and commercial buildings. General questions can be answered on the phone or, you might want us to make a site visit to access more in-depth your potential savings. From the information gathered we will produce a prioritized bullet list of things to consider.